Productivity in building design and construction
Productivity is the relationship between goods and services produced and the resources used. This concept is critical for the development of any business activity, as those that do not improve their productivity compared to their competitors, are likely to fail.
An increase in production does not necessarily translate into an increase in productivity. To increase productivity, all processes that constitute a company’s activity must be analysed and their efficiency optimised. The resources necessary to increase productivity are:
Capital investment:
- Design of new procedures or improvement of existing ones.
- Installation of more modern machinery or equipment, with a greater capacity or modernisation of existing equipment.
Improved management through a reduction in:
Productivity must not be confused with performance, which is the relationship between forecast and executed work.
Loss in productivity (in terms of time of execution) results from inefficiencies in the total time invested throughout an operation.
The time taken for activities can be broken down into the following:
- Base work content. This is the quantity of work that would be required to manufacture a product or develop an activity if the project were to be perfect, if the procedure, manufacturing or execution method were ideal or if there were no losses in time attributable to any cause. This is the minimum possible time for execution.
- Unnecessary work. This is additional work required due to poor design or specification of the product, or inefficient production or operating methods.
- Ineffective or unproductive time, due to deficiencies in management or deficiencies in workers.
This text in this article is based on an extract from CONSTRUCTION MANAGEMENT, by Eugenio Pellicer, Víctor Yepes, José M.C. Teixeira, Helder Moura and Joaquín Catala. Valencia, Porto, 2008. The original manual is part of the Construction Managers’ Library – created within the Leonardo da Vinci (LdV) project No: PL/06/B/F/PP/174014, entitled: “COMMON LEARNING OUTCOME FOR EUROPEAN MANAGERS IN CONSTRUCTION”. It is reproduced here in a modified form with the kind permission of the Chartered Institute of Building.
--CIOB
NB Social Value and Design of the Built Environment, published by the Supply Chain Sustainability School in 2017, suggests that: ‘Productivity is about doing (or achieving) more with the same. It can relate to financial returns, and also to outcomes such as learning and health.’
Reinventing Construction: A Route To Higher Productivity, published by the McKinsey Global Institute in February 2017, states: ‘…In its purest form, productivity can be described as the output achieved by a given amount of input.’
See also: What is productivity, and how do you measure it?
[edit] Related articles on Designing Buildings Wiki
- Benchmarking.
- Delivering an infrastructure revolution.
- Earned value.
- Identifying the causes of trends in construction labour productivity.
- Key Performance Indicators.
- Productivity in construction: Creating a framework for the industry to thrive.
- Study reveals cost of inefficient contact tracing.
- Tackling the productivity challenge.
- The history of human resource management.
- What is productivity, and how do you measure it?
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Planning condition discharge in England and Wales
A brief exoplanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.





















Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.